Reduce gas and jetpack capacity (#18288)

Emergency tank: 4 minutes (down from 12)
Extended Etank: 9 minutes (down from 37)
Double Etank : 15 minutes (down from 62)
Full tank : 31 minutes (down from 94)

This will make it so EVA crews actually need to watch their pressure if they spend significant time outside the station, and/or have a canister in their general vicinity.

Emergency tanks can no longer be used on timescales that far exceed escaping an emergency situation, but will probably be insufficient in extended emergencies, where access to canisters will now be much more important. How well this works in practice will have to be carefully watched.
This commit is contained in:
Errant
2023-08-04 22:40:41 +00:00
committed by GitHub
parent 084da94f6a
commit 02b06cce39
5 changed files with 128 additions and 115 deletions

View File

@@ -198,7 +198,7 @@ namespace Content.Shared.Atmos
/// <summary>
/// This is calculated to help prevent singlecap bombs (Overpowered tritium/oxygen single tank bombs)
/// </summary>
public const float MinimumTritiumOxyburnEnergy = 430000f;
public const float MinimumTritiumOxyburnEnergy = 143000f;
public const float TritiumBurnOxyFactor = 100f;
public const float TritiumBurnTritFactor = 10f;