Files
OldThink/Resources/Textures/Structures/Machines/parts.rsi/meta.json
Peptide90 f88358a12a Substations now explode when destroyed (#5729)
* Substation destructible component

Substations now explode and create a destroyed machine which can be deconstructed.

* construction graph test failed

Does not need a path from start to finish but adding anyway to fix tests

* railing to structures

* Fixed Review

Updated parent to fix most comments.
Updated node to camelcase

* Updated target node graph

Still recovering...

* Final fix of graph

I swear

* Altered destroyed machine spawns

Removed HV cable and reduced steel sheets.
2022-01-01 17:51:56 +01:00

56 lines
828 B
JSON

{
"version": 1,
"size": {
"x": 32,
"y": 32
},
"license": "CC-BY-SA-3.0",
"copyright": "Taken from tgstation at https://github.com/tgstation/tgstation/commit/0d9c9a8233dfc3fc55edc538955a761a6328bee0, destroyed modified by Peptide90",
"states": [
{
"name": "0",
"directions": 4
},
{
"name": "1",
"directions": 4
},
{
"name": "2",
"directions": 4
},
{
"name": "3",
"directions": 4
},
{
"name": "4",
"directions": 4
},
{
"name": "box_0"
},
{
"name": "box_1"
},
{
"name": "box_2"
},
{
"name": "vbox_0"
},
{
"name": "vbox_1"
},
{
"name": "vbox_2"
},
{
"name": "vbox_3"
},
{
"name": "destroyed"
}
]
}